KULOB SOLID WASTE PROJECT – FEASIBILITY STUDY

01.05.2015 - 31.10.2015

Tajikistan

Overall project value (EUR)280 000
No. of staff provided
Name of ClientKulob SUE KMK
Financing agencyFUNDED BY EBRD
Name of partners
Detailed Narrative Description of Project

The overall assignment can be categorised into the following five tasks:

1: Baseline study of the solid waste sector;

2: Project proposal;

3: Environmental and social appraisal;

4: Institutional reform proposal; and,

5: Financial and economic analysis.

Detailed Narrative Description of Services provided

Based on the topographical data, will prepare either:

(1) detailed design for rehabilitation and upgrading of existing dumpsites, including:

  • 3D topographical model of the dumpsite;
  • Design of embankments protecting the dumpsites from the erosion by the river (if any) and insulating the waste;
  • Design (if feasible) of a draining system for the leachate collection;
  • Design (if feasible) of a network of biogas collection;
  • Cover of the dumpsites.

(2) detailed design for the new landfill/other waste management option in the proposed site

Estimate either: (1) the volume of waste to be removed and the associated costs of such a removal; or (2) costs for the construction of the landfill/another waste management option and for the equipment.