Projects

CASA-1000, PROVISION OF CONSTRUCTION SUPERVISION SERVICES FOR DESIGN, SUPPLY AND INSTALLATION OF HVAC TRANSMISSION LINES AND ASSOCIATED SUBSTATIONS IN TAJIKISTAN

01.02.2019 - 31.05.2021

Tajikistan

Overall project value (EUR)USD 648 000
No. of staff provided
Name of ClientJHSC “Barki Tojik”
Financing agencyFUNDED BY WB
Name of partnersMonenco Iran
Detailed Narrative Description of Project

The project will build a cross-border power trade facility, comprising about 475 km of 500kV HVAC transmission lines to carry power from Kyrgyz Republic to Tajikistan at Khujand; a 1300 MW HVDC converter in

Tajikistan (at Sangtuda) and thereafter a 750km long ±500kV HVDC transmission link via a 300 MW HVDC converter in Kabul, to a 1,300 MW terminal with HVDC converter facilities in Pakistan. The AC to DC convertor station would be designed to help power trade in any direction and would offer significant emergency system support to the national grids of the countries connected through HVDC system.

Detailed Narrative Description of Services provided

The services of an Owner’s Engineer (the Project Consultant) are required for the implementation phase of the CASA-1000 Project for the 25 km 500 KV HVAC Transmission Line (from border of Kyrgyz Republic to Khujand) traversing the territories of Kyrgyz Republic and Tajikistan. Inside the territory of Tajikistan, a 500KV HVAC transmission line from Regar to Sangtuda is also included (total length 115 km) in the scope of services. The Project Consultant will assist implementing agency of HVAC sections of the CASA-1000 project in construction supervision, support for project implementation, audit and TA. Specifically, the Consultant’s support would be needed in the design, construction supervision and commissioning of the 500 KV HVAC line and substations.)