01.06.2014 - 31.10.2014
Kyrgyzstan
Overall project value (EUR) | 110 000 USD | |
No. of staff provided | 9 | |
Name of Client | ARIS | |
Financing agency | WB World Bank | |
Name of partners | FCG International Ltd | |
Detailed Narrative Description of Project |
- To establish a database detailing existing SNiPs and SanPin technical standards used by water and sanitation professionals in the Kyrgyz Republic alongside the equivalent/proposed European Union/WHO technical design standards and methods of accessing those documents. | |
Detailed Narrative Description of Services provided |
international best practice and standards, for example from the European Union and WHO, and ii) areas in which technical design practices diverge from current practice in civil engineering in the water and wastewater sector. |